Contact UsNewsletter
Energy Consulting Practice
Get in Touch
downstream2023

Bonny LNG Expansion FEED

📍Bonny Island, Nigeria

Project overview

The Bonny LNG Train 7 expansion FEED was one of the most complex engineering studies Energy Consulting Practice has undertaken. Our team of process, mechanical, structural, and marine engineers worked alongside the client's technical authority to develop a full FEED package compliant with LNG export facility standards. Key deliverables included process simulation and equipment sizing for the liquefaction train, revised jetty mooring analysis for larger LNG carriers, utilities and offsite modifications, and a detailed cost estimate with ±10% accuracy.

Key achievements

1Train 7 FEED package delivered on schedule
2Process simulation validated at ±2% vs licensors model
3EPC tender package issued to 5 shortlisted contractors
4Cost estimate accuracy ±10% confirmed by independent review
Project details
ClientNLNG Consortium
Contract value$4.8M (FEED)
Duration24 months
LocationBonny Island, Nigeria
Year2023
SectorDownstream

Interested in a similar project scope? Our team is available for scoping and proposals.

Start a Conversation →